Town of Great Barrington
Rt. 7/23 Water Main Replacement
PROJECT DETAILS
The work consists of replacement of approximately 7,200 linear feet of existing water main with varying size ductile iron water main, including new valves, hydrants, service connections, side street connections, pipe jacking of 120 LF of 12″ ductile iron piping, and surface restoration.
SERVICES INCLUDED
- Water Main Installation
- Roadway Reconstruction
- Pipe Jacking